Los Angeles Metro Building Permits Guide
CSLB license required for any work > $500; Title 24 + local building permits for MEP/structural. Licensing in California is managed by California CSLB. Most Los Angeles Metro homeowners should require their contractor to pull permits in the contractor's name so liability for code violations rests with them.
Key points
- Confirm whether your scope triggers a California permit (structural, electrical, plumbing, mechanical, additions, demo).
- Have your licensed contractor pull the permit in their name — this shifts inspection liability to them.
- Budget 1–3% of project value plus plan-check fees (USD 200–USD 1,500 depending on scope).
- Schedule rough-in and final inspections in advance — re-inspections cost extra and delay the build.